Consultancy work for traffic count survey of categorize vehicles (2-Wheeler, 3-Wheeler, Car, LCV and State Bus) count at (i) Vadodara –Halol Section of SH-87 From Km 8+300 to 40+000 (4-lane Road) &(ii) Ahmedabad –Mehsana Section of SH-41 From Km 19+000 (Adalaj) to Km 70+000 (Mehsana) Read More »
Safety Consultancy Services for Rehabilitation of Valbhipur ( Km 0+965 to Rangola (km 27+588) Section of SH-39 of Second Gujarat State Highway Project (GSHP) Read More »
Proposed laying of 1800mm dia. MS Water pipeline through 2500 X 3000 mm RCC Box under the track at Km 396/5-6 between Naroda and Medra Railway stations on Ahmedabad-Himmatnagar rail section by Additional City Engineer (Water Project) Read More »
Safety Consultant for Up-gradation of 2 Lane with Paved Shoulder for section from Km 118.900 to km 156.955 (excluding ch.151.100 to 154.730 of Balotra to Sanderao via Jalore (excluding ongoing BOT Project) Section of NH-325 in the State of Rajasthan on EPC mode ( Package-III) Read More »
Safety Consultancy Service for “ Development of Chiloda – Gandhinagar of NH- 147 ( Old NH-8C) From Km 0+0 to 44+420 in state of Gujarat to Six –lane with paved Shoulder with both side Continues service road on EPC Mode ( job no 147/GJ/2017-18/607) Package-1 km 0+0 to 16+350 Read More »
Widening and construction of ROB Sola at Km 508/9-509/0 between Station ADI-SAU on ADI – VG section Read More »
Project Management Consultancy Services for Proposed laying of 2200 mm dia RCC NP-4 Drainage pipe line through 3500mm x 3500mm RCC Box Under the Railway track at Km 490/8-9 Between Vatva & Maninagar Stations on GER-ADI Section Read More »
Safety Consultancy Services for 4 Lane laning with paved shoulder paved of Madhavpur to Porbandar Section of NH-8E (ext) old NH-51(new) from km 338+400 (design) Chainage km 338+400) to km 379+100 (Design Chainage km 379+100) in the state of Gujarat Read More »
Consultancy Services of Annual Potential Collection Survey for the Alwa Kampa Toll Plaza (At Km 80+980 of SH-59) on ‘Nadiad – Mahudha – Kathlal – Kapadwanj – Bayad – Modasa Section from Km 0+600 to Km 109+000’ under SHDP DBFOT Annuity Packages -8. Read More »
Project Management Consultancy Services for Widening and construction of ROB Khodiyar at Km 515/9-10 between Station SBI-KHD section (Railway portion only) Read More »