2019

Services of Independent Engineer for Two Laning with Paved Shoulders of Stretches of State Highways under SHDP mainly operated and maintained on (DBFOT) Annuity Basis State Highway Development Project (SHDP) Package-01 to 08 in the state of Gujarat

Services of Independent Engineer for Two Laning with Paved Shoulders of Stretches of State Highways under SHDP mainly operated and maintained on (DBFOT) Annuity Basis State Highway Development Project (SHDP) Package-01 to 08 in the state of Gujarat Read More »

Consultancy Services for preparation of Detailed Project Report for Widening of existing 2-Lane to 4-Lane of Morbi Bypass to Navalakhi Port from Km 67+000 to 108+000 (SH-24) including three ROBs Under State Highway Development Program (SHDP) in the State of Gujarat

Consultancy Services for preparation of Detailed Project Report for Widening of existing 2-Lane to 4-Lane of Morbi Bypass to Navalakhi Port from Km 67+000 to 108+000 (SH-24) including three ROBs Under State Highway Development Program (SHDP) in the State of Gujarat Read More »

Safety Consultant for “Upgradation of Mehsana Bypass Section of SH-41 A from Panchot Junction (Km 11+743) to Fatehpura Junction (Km 16+450) from 2-Lane to 4-Lane Divided Carriageway Configuration” in the State of Gujarat under Second -Gujarat State Highway Project (GSHP-II/EPC/02) on EPC basis.

Safety Consultant for “Upgradation of Mehsana Bypass Section of SH-41 A from Panchot Junction (Km 11+743) to Fatehpura Junction (Km 16+450) from 2-Lane to 4-Lane Divided Carriageway Configuration” in the State of Gujarat under Second -Gujarat State Highway Project (GSHP-II/EPC/02) on EPC basis. Read More »