Independent Engineer Services for Supervision of 6-Laning work “Upgrading of Shantipura Chokdi to Khoraj GIDC Chokdi SH-17 from Existing 4 Lane with Paved Shoulder to 6 Lane with Paved Shoulder and Service Road on BOT (Toll) basis for Km 13+930 to Km 42+683) a section of Ahmedabad-Viramgam-Maliya Toll Road. Leave a Comment / 2025, 2026 / Hima Thumar Independent Engineer Services for Supervision of 6-Laning work “Upgrading of Shantipura Chokdi to Khoraj GIDC Chokdi SH-17 from Existing 4 Lane with Paved Shoulder to 6 Lane with Paved Shoulder and Service Road on BOT (Toll) basis for Km 13+930 to Km 42+683) a section of Ahmedabad-Viramgam-Maliya Toll Road. Read More »
Services of Independent Engineer for Two Laning with Paved Shoulders of Stretches of State Highways under SHDP mainly operated and maintained on (DBFOT) Annuity Basis State Highway Development Project (SHDP) Package-01 to 08 in the state of Gujarat Leave a Comment / 2017, 2018, 2019, 2020, 2021, 2022, 2023, 2024, 2025, 2026 / Amisha Vadi Services of Independent Engineer for Two Laning with Paved Shoulders of Stretches of State Highways under SHDP mainly operated and maintained on (DBFOT) Annuity Basis State Highway Development Project (SHDP) Package-01 to 08 in the state of Gujarat Read More »
Services of Independent Engineer for the augmentation of 2 lane paved shoulder under change of Scope of Dwarka to Okha Road from Km 232+000 to Km 261+750 section of SH-25. into 4 Laning with paved shoulder of Dwarka to Okha Road from km 232+000 to Km 261+750 section of SH-25 under in the state of Gujarat Leave a Comment / 2023, 2024, 2025, 2026 / Amisha Vadi Services of Independent Engineer for the augmentation of 2 lane paved shoulder under change of Scope of Dwarka to Okha Road from Km 232+000 to Km 261+750 section of SH-25. into 4 Laning with paved shoulder of Dwarka to Okha Road from km 232+000 to Km 261+750 section of SH-25 under in the state of Gujarat Read More »
Consultancy Services for “Independent Consultant for Mehsana-Himatnagar four laning From Km 103+000 to Km 163+751 section of SH-55 on DBFOT Design, Build, Finance, Operate & Transfer Annuity Contract under GSHP-II for Operation Period” Leave a Comment / 2023, 2024, 2025, 2026 / Amisha Vadi Consultancy Services for “Independent Consultant for Mehsana-Himatnagar four laning From Km 103+000 to Km 163+751 section of SH-55 on DBFOT Design, Build, Finance, Operate & Transfer Annuity Contract under GSHP-II for Operation Period” Read More »
Engaging Consultancy Service for preparation of General Arrangement drawing etc. for the works of Construction of proposed ROB and its approaches in replacement of existing Level Crossing No.87 on NH 848-B at Udvada Railway crossing @ Km 28/4 to 28/6 on EPC mode under NH (O) in the state of Gujarat. Leave a Comment / 2024, 2025, 2026 / Amisha Vadi Engaging Consultancy Service for preparation of General Arrangement drawing etc. for the works of Construction of proposed ROB and its approaches in replacement of existing Level Crossing No.87 on NH 848-B at Udvada Railway crossing @ Km 28/4 to 28/6 on EPC mode under NH (O) in the state of Gujarat. Read More »
Independent Engineer Services for Operation & Maintenance of following of Projects under Built Operate & Transfer basis in the State of Gujarat. Ahmedabad- Viramgam-Maliya Road SH-7 & 17(Project length: 180.74Km), Rajkot-Jamnagar-Vadinar Road SH-25(Project length: 131.65Km), Halol-Godhra-Shamlaji Road SH-5(Project length: 173.06Km), Deesa-Panthawada-Gundari Road, SH-7(Project length: 44.32 Km) Leave a Comment / 2024, 2025, 2026 / Amisha Vadi Independent Engineer Services for Operation & Maintenance of following of Projects under Built Operate & Transfer basis in the State of Gujarat. Ahmedabad- Viramgam-Maliya Road SH-7 & 17(Project length: 180.74Km), Rajkot-Jamnagar-Vadinar Road SH-25(Project length: 131.65Km), Halol-Godhra-Shamlaji Road SH-5(Project length: 173.06Km), Deesa-Panthawada-Gundari Road, SH-7(Project length: 44.32 Km) Read More »
Construction of Additional Two lane for Rajkot Jamnagar Vadinar Road (SH-25 to make it four lane divided carriageway facility under Viability Gap Funding Scheme of Government of India on BOT basis -Appointment of Safety Auditor Leave a Comment / 2025, 2026 / Amisha Vadi Construction of Additional Two lane for Rajkot Jamnagar Vadinar Road (SH-25 to make it four lane divided carriageway facility under Viability Gap Funding Scheme of Government of India on BOT basis -Appointment of Safety Auditor Read More »
Construction of Additional Two lane for Ahmedabad-Viramgam-Maliya Road (SH-7& 17) to make it four lane divided carriageway facility under Viability Gap Funding Scheme of Government of India on BOT basis Appointment of Safety Auditor Leave a Comment / 2025, 2026 / Amisha Vadi Construction of Additional Two lane for Ahmedabad-Viramgam-Maliya Road (SH-7& 17) to make it four lane divided carriageway facility under Viability Gap Funding Scheme of Government of India on BOT basis Appointment of Safety Auditor Read More »
Consultancy Work for “Preparation of Detailed Project Report (DPR) and GAD of 2Nos. ROB and Approval from Railway for Construction of four lane Road from Fathepur road to Nawalgarh Road (6.5km)with 2 ROB Dist Sikar Leave a Comment / 2025, 2026 / Amisha Vadi Consultancy Work for “Preparation of Detailed Project Report (DPR) and GAD of 2Nos. ROB and Approval from Railway for Construction of four lane Road from Fathepur road to Nawalgarh Road (6.5km)with 2 ROB Dist Sikar Read More »